Applications

Add fire protection
or combine it with reroofing?

When reroofing, plan SHEET beneath the new membrane. If the existing membrane stays, consider VLOEI mineral roof coating or WEER exterior boards. Access, added load and drainage determine the installation.

  1. 01New roof or new membrane
  2. 02Existing waterproofing stays
  3. 03Mineral boards on the roof surface beneath PV
New roof or new membrane

01 · Applications

New roof or new membrane

On a new build or a complete membrane replacement, the roof build-up is open. A mineral protection and load-spreading board such as VlamShield SHEET can then be installed between the insulation and new membrane. It provides a flat substrate for waterproofing. The added weight is included in the structural calculation, and board installation is coordinated with the waterproofing work.

What matters

  • Choose membrane and insulation that are assessed together with the cover board as a system
  • Include the added weight of the board in the structural calculation
  • Plan staggered joints for insulation, board and membrane
  • Work out roof edges and penetrations as separate details
Existing waterproofing stays

02 · Applications

Existing waterproofing stays

If the roof membrane is intact, a mineral protective layer above it can avoid removing the waterproofing. WEER is an option as water-resistant exterior boards. VLOEI is a cement-bound mineral roof coating with reaction-to-fire class A1, applied to a prepared substrate and cured on site. For boards, consider support on the membrane and wind restraint; for roof coatings, adhesion and application temperature. The area beneath existing PV modules must be accessible, so partial dismantling may be necessary.

What matters

  • Adhesion test on the roof before the quotation becomes final
  • Record the condition of seams, upstands and outlets
  • Account for weather conditions and seasons: temperature, moisture and rain
  • Detail terminations at support feet and upstands separately
Mineral boards on the roof surface beneath PV

03 · Applications

Mineral boards on the roof surface beneath PV

On PVC-P, granule-surfaced bitumen, PIB or TPO/FPO, WEER is an option as water-resistant boards directly beneath the PV installation. The membrane continues to provide waterproofing, while outlets and maintenance points remain accessible.

What matters

  • Record the exact membrane product and its condition
  • Assign contact compatibility and any intermediate layer
  • Plan weight per unit area and wind restraint together
  • Preserve drainage and maintenance access

Applications

Where things go wrong: seams, outlets, upstands

The protective layer must work across the roof and at interruptions. Mark joints, outlets and upstands on the layout before ordering.

  1. 01

    Seams and joints

    Joint staggering follows the selected roofing system. Movement joints must retain their function. Membrane laps and transitions need separate detailing when applying a mineral roof coating.

  2. 02

    Outlets and emergency overflows

    Every layer stops short of outlets and overflows. No intervention may reduce drainage; the check is part of handover.

  3. 03

    Upstands and roof edges

    Fixing and drainage change at upstands. Design the board termination, membrane junction and inspection access together. Any penetration through the waterproofing needs a suitable sealed detail.

Project enquiry

Send your roof build-up. Discuss the material choice.

A few photos and the roof area are enough to start. You receive a project proposal with the specific configuration, the supporting documentation and the open points we agree with you.

Illustration of the digital AI project adviser
AI assistant

Your roof. Your questions.

Hello! I am VlamShield’s AI project adviser. What would you like to know about your roofing project?

What are you planning?

or drop them here

    JPG, PNG, WebP, PDF or TXT · up to 3 files, 10 MB each, 15 MB total · up to 6 images/PDF pages.

    Attachments are sent to OpenAI only with your question and stay selected for follow-up questions. We do not store them permanently or automatically attach them to project enquiries.

    AI guidance, not technical approval. Text and attachments are sent to OpenAI. Remove personal and confidential details first. Privacy