
New roof or new membrane
The build-up is open. This is when a cover board fits between insulation and membrane.
Matching product lineVlamShield SHEET
View the applicationMineral roof layers for solar roofs
SHEET beneath a new roof membrane. VLOEI as a mineral roof coating above existing waterproofing. WEER as water-resistant boards beneath PV. Three solutions for commercial flat roofs, matched to your roof build-up.
For building owners, roofers and PV designers: compare materials, installation positions and labour for your roof.

Beneath the membrane or above the waterproofing
Product lines
When replacing the membrane, plan SHEET beneath it. If the membrane stays, compare VLOEI mineral roof coating with WEER water-resistant exterior boards. Added weight, fixing and the installation sequence then guide the choice.
Roof build-up
Select a layer below or above the waterproofing in the section. Below the membrane, the mineral layer is sheltered from direct weather exposure. Above it, rain, frost, wind and contact with the existing membrane also matter.
Schematic positions, not an installation drawing. WEER and VLOEI show alternative material routes above the membrane; SHEET sits below it. The illustrated layers are not automatically combined.
Applications
This decision narrows the product choice early. Next, establish whether the PV array is already installed and how the roof will be accessed for the work.

The build-up is open. This is when a cover board fits between insulation and membrane.
Matching product lineVlamShield SHEET
View the application
WEER water-resistant boards or VLOEI mineral roof coating: two options above the existing membrane.
Matching product lineVlamShield VLOEI
View the application
The existing waterproofing stays. WEER adds the mineral layer above it.
Matching product lineVlamShield WEER
View the application

In practice
SHEET is planned between insulation and a new membrane. The mineral protection and load-spreading board sits beneath the waterproofing layer. Support, joints and loads are matched to the specific construction.
WEER is planned above the existing waterproofing beneath PV as an additional mineral protective layer. For PVC-P, mineral-surfaced bitumen, PIB and TPO/FPO, the contact layer, drainage and wind restraint are matched to the specific roof.
VLOEI is spread over the prepared substrate with a squeegee or trowel. This accommodates different geometries but introduces mixing and curing time. With existing PV, the work area must be accessible; partial removal may be necessary.
We separate strictly: reaction to fire of the material, performance of the complete roof assembly and system assessments. The project proposal states which document belongs to which layer.
Knowledge
What does A1 mean for the whole roof? How much does an extra layer weigh? When does a second layer double the material cost? Explore calculations, test reports and selection criteria.



Project enquiry
A few photos and the roof area are enough to start. You receive a project proposal with the specific configuration, the supporting documentation and the open points we agree with you.
Or directlyinfo@vlamshield.nl