VlamShield SignetVlamShield

VlamShield WEER · Weather-resistant mineral board above waterproofing beneath PV

The mineral board.
Directly beneath your PV.

WEER places a weather-resistant, glass-fibre-reinforced mineral board on the roof surface beneath the PV installation. It sits above the water-carrying waterproofing: on PVC-P, granule-surfaced bitumen, PIB or TPO/FPO, directly on the membrane with project-specific wind restraint. The membrane is retained and continues to provide waterproofing.

Position in the roof
On the roof surface, above the waterproofing
Suited to
New and existing PV roofs
VlamShield WEER: Weather-resistant mineral board above waterproofing beneath PV

01 · Function

Function and installed position

On an existing PV roof, the area beneath the membrane is often accessible only with substantial work. WEER works above that level: a cement-bound mineral board is added to the roof surface beneath and between the modules. This enables a mineral protective layer to be planned while the existing roof waterproofing retains its function.

Material durability, load distribution and detailing are considered together. For PVC-P, granule-surfaced bitumen, PIB and TPO/FPO, the specific board is coordinated with the actual membrane. Water must be able to drain beneath the layer; wind restraint is designed for the building.

Positions of mineral materials in a PV roofSchematic of possible positions: SHEET beneath a new membrane; WEER as a board or VLOEI as a roof coating above the waterproofing beneath PV. Material routes are selected for each project and are not automatically combined.PV module on supportsVLOEI · mineral roof coatingRoof waterproofingSHEET · cover board beneath the membraneThermal insulationVapour control layerStructural deck (profiled steel)WEER · board above waterproofing beneath PV

Schematic positions, not an installation drawing. WEER and VLOEI show alternative material routes above the membrane; SHEET sits below it. The illustrated layers are not automatically combined.

What loads act here?

  1. Fire exposure beneath PV

    A mineral layer sits where a fire between modules and roof can expose the surface. Its thickness, joints and the assembly beneath it determine the technical assessment.

  2. Weather and moisture

    The exterior board is selected for rain, moisture cycling and frost. What counts is the documentation for the specific version and a construction that drains water.

  3. PV supports and maintenance

    Supports, contact areas and foot traffic create point loads. Board edges, membrane and insulation are considered as one continuous load path.

VlamShield WEER · Material build-up

02 · Material

Material build-up

WEER by VlamShield is a 15 mm cement-bonded, glass-fibre-reinforced lightweight concrete board. The uncoated board is non-combustible (A1), water-resistant and suitable for weather-exposed outdoor applications. The product data sheet sets out the values and testing scope.

  • Cement-bound mineral matrix with glass-fibre reinforcement
  • Documented exterior application as a selection criterion
  • Material class and performance scope established from the actual documents
  • Thickness and surface mass matched to roof loading and the protection task

03 · Installation

Installation on the roof

  1. 01

    Identify the membrane

    Record PVC-P, granule-surfaced bitumen, PIB or TPO/FPO with the precise product designation and condition. Document seams, low spots and repairs.

  2. 02

    Coordinate contact and loading

    Lay the boards directly on the waterproofing. Assess flatness, supports and load distribution together.

  3. 03

    Plan the board area

    Define the area beneath PV, perimeter zones and maintenance routes on the plan. Include joints, cutting and accessible connections in the installation drawing.

  4. 04

    Provide wind restraint

    Design fixing or ballast for the building and roof zone. Include additional loads in the structural assessment and keep the waterproofing fully functional.

  5. 05

    Check drainage

    Keep outlets, emergency overflows and inspection points clear. Water on the existing membrane must be able to drain freely.

VlamShield WEER · Illustration of installation

Joints, outlets and upstands

Across the roof surface

The main application is mineral boards above the waterproofing directly beneath the PV installation. Supports, joints and load distribution are planned across the area.

At edges and upstands

WEER can additionally be used in exposed edge and connection details. Vertical fixing and drainage require their own design.

At outlets and penetrations

Cutting and connections preserve drainage and maintenance access. The board is an additional layer; the membrane remains water-carrying.

04 · Data

Technical data

Product data and position

WEER · 15 mm · Water-resistant. Technical values apply to the uncoated board.

WEER positionAbove waterproofing beneath PV; also at edge details
Membranes consideredPVC-P, granule-surfaced bitumen, PIB, TPO/FPO
MaterialCement-bound, glass-fibre-reinforced mineral board
Reaction to fireA1 under EN 13501-1
Outdoor useWater-resistant; suitable for weather-exposed outdoor applications
Mass per area at 15 mmApprox. 12 kg/m² at 7% moisture content
Contact and fixingDirectly on the waterproofing; fixing designed for the project

05 · Selection

When yes, when no

Suitable

  • Mineral protective layer above retained roof waterproofing beneath PV
  • PVC-P, granule-surfaced bitumen, PIB and TPO/FPO with coordinated contact
  • Projects with suitable spare structural capacity and wind restraint
  • Exposed edge, upstand and connection details

Not suitable

  • As a replacement for the water-carrying membrane
  • Above damaged waterproofing without prior repairs
  • Without a loading and wind-restraint concept
  • With blocked outlets or inaccessible maintenance points

06 · Questions

Questions from practice

Is WEER only intended for roof edges?

No. The main focus is the roof surface above the waterproofing directly beneath the PV installation. Edges, upstands and penetrations are additional applications.

Which roof membranes are considered for WEER?

PVC-P, granule-surfaced bitumen, PIB and TPO/FPO. The boards are laid directly on the waterproofing.

Is the existing waterproofing retained?

Yes, that is a key aim of this layer position. A suitable condition is required. The membrane remains water-carrying; drainage, seams and connections are included in the design.

How much weight should I allow for?

The 15 mm board weighs approximately 12 kg/m² at 7% moisture content. The standard 2,600 × 1,250 mm board weighs about 39 kg by calculation. Allow for moisture, tolerances and ballast in the roof design.

How is the surface restrained against wind?

Roof height, location, edge and corner zones and the specific construction determine the design. Fixing, ballast and waterproofing details are specified together.

Project enquiry for VlamShield WEER

What we need for a quotation

With this information we prepare a concrete proposal: configuration, quantity, documentation and programme. If something is missing, we ask.

Project enquiry
  1. Type, product designation and condition of roof waterproofing
  2. Roof area, building height, location and drainage
  3. PV plan showing supports, ballast and maintenance routes
  4. Spare structural capacity and proposed board layout
  5. Protection requirement and installation programme

Project enquiry

Send your roof build-up. Discuss the material choice.

A few photos and the roof area are enough to start. You receive a project proposal with the specific configuration, the supporting documentation and the open points we agree with you.

Illustration of the digital AI project adviser
AI assistant

Your roof. Your questions.

Hello! I am VlamShield’s AI project adviser. What would you like to know about your roofing project?

What are you planning?

or drop them here

    JPG, PNG, WebP, PDF or TXT · up to 3 files, 10 MB each, 15 MB total · up to 6 images/PDF pages.

    Attachments are sent to OpenAI only with your question and stay selected for follow-up questions. We do not store them permanently or automatically attach them to project enquiries.

    AI guidance, not technical approval. Text and attachments are sent to OpenAI. Remove personal and confidential details first. Privacy